Place of Origin: | China |
Brand Name: | JZQL |
Certification: | ISO9001 |
Model Number: | JBEC200 |
Minimum Order Quantity: | 1 |
---|---|
Price: | USD1000~USD1200 per ton |
Packaging Details: | seaworthy packings for container shipping |
Delivery Time: | 30 days |
Payment Terms: | L/C, T/T, D/A, D/P, Western Union |
Supply Ability: | 10000 units per year |
Material: | Q345B Steel | Surface Treatment: | Painted Or Hot Dip.etc |
---|---|---|---|
Size: | According To Client's Need | Installation: | Lifted Into Place By Hand Without Crane, Easier Construction.etc |
Multi-use: | Civil Engineering Construction Projects And To Provide Temporary Crossings For Foot & Vehicle Traffic. | Carry Capacity: | Resist Strong Wind And Earthquake, Bears Heavy Snow.etc |
Type: | 200-type |
Description of Pre-engineered Modular Bridging
Pre-engineered Modular Bridging are new kinds of assembly steel bridges, comprising longitudinal trusses that are formed of steel beam chords and pre-fabricated modular steel panel webs, connected end to end with transverse cross girders spanning between them that support a two lane or a single lane, steel deck roadway or concrete roadway
The surface protection can be paint or hot-dip galvanized.
Specification of Pre-engineered Modular Bridging
Specifications: | ||
Single lane | Standard roadway: 4.2m | Single span: 35m-81m |
Double lane | Standard roadway:7.35m | Single span: 35m-72m |
Load: design according to different requirements | ||
Deck: steel deck / concrete deck |
Competitive Advantage:
|
|
|
|
|
|
Advantage
Possessing the features of simple structure,
convenient transport, speedy erection
easy disassembling,
heavy loading capacity,
great stability and long fatigue life
being capable of an alternative span, loading capacity
Features
1. High strength and big stiffness , relative to the concrete bridge can be reduced trabecular high and self-respect
2. Due to the steel isotropic, quality of a material is uniform and modulus of elasticity, that make steel bridge in the working condition and calculation compared with the assumption
3. Steel bridge generally USES factory, site splicing, the construction period is short, processing convenient and not affected by seasonal effect.
4. Steel bridge is suitable for industrialized manufacture and very convenient to transport.
5. Steel bridge is easy to repair and replace,long lifetime,material can be recycled.
Application
Beam bridge,arch bridge,rigid frame bridge,cable-stayed bridge,suspension bridge. passenger foot-bridge