Sales & Support: Request A Quote
Home ProductsStructural Steel Fabrication

Comflor 210 , Comflor 60 , Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing

Comflor 210 , Comflor 60 , Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing

    • Comflor 210 , Comflor 60 , Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing
    • Comflor 210 , Comflor 60 , Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing
    • Comflor 210 , Comflor 60 , Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing
  • Comflor 210 , Comflor 60 , Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing

    Product Details:

    Place of Origin: China
    Brand Name: JZQL/FAMOUS
    Certification: ISO9001
    Model Number: JBEC200

    Payment & Shipping Terms:

    Minimum Order Quantity: 1000sqm
    Price: USD10-20/sqm
    Packaging Details: seaworthy packings for container shipping
    Delivery Time: 1-4 weeks per production plan
    Payment Terms: D/A, L/C, D/P, T/T, Western Union
    Supply Ability: 50000sqm per month
    Contact Now
    Detailed Product Description
    Material: Steel Decking Formwork Type: Conflor 60, 80, 210
    Color: Grey Zinc: 275g/m2
    Surface: Zinc Spangle Width: 910mm
    Thickness: 1.25mm Surface Treament: Galvanized

    Comflor 210 , Comflor 60 , Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing

    ComFlor 60 has been much copied but never bettered, as the original new generation round shouldered trapezoidal combined 60mm profile. This design is exceptionally resistant to compressive buckling resulting in superior span capability compared to traditional decks.

     

    ComFlor 80 is the big sister to ComFlor 60 with the same round shoulder combined profile technology applied to an 80mm deep trapezoidal shape to give big spans. The use of this profile allows a designer to reduce still further the number of secondary beams in a building.

     

    ComFlor 210 has very effective cross stiffener technology and the deep profile shape provides a very efficient metal deck and composite slab, with a low usage of concrete. Slimflor systems have wider lower flange steel beams that allow the deck to land on the bottom flange.

     

    The steel decking supports the wet concrete and construction loads. Temporary propping is eliminated and steel lost formwork is left in situ which gives fast, easy construction. The concrete slab requires full structural bar or mesh reinforcement. The wide range of Tata Steel formwork profiles ensure the optimum solution is available.

     

    Specifications:

    Name steel decking formwork
    Base material Hot Dipped Galvanized Steel Sheet
    Steel Grade SGCC
    Yield strength Q235 or Q345 Refer to Standards GB/T1591-2008
    Thicknes 0.8 -1.5mm(normal 0.8,1.0,1.2)
    Zinc coating 60-275g/m2
    Wave Height 51mm-76mm
    EffectiveWidth 688mm-940mm

     

    Length

    0-11.8m
    Less than 5.8m load in 20GP
    5.8m-11.8m load in 40GP
    Packing Bundle ,water-proof package with steel belt
    Delivery time 20 days after confirmation

     

     

    Following are some of typical profiles available in market:

    1. Closed type galvanized steel floor decking
    YXB51-200-600
    YXB65-186-558
    YXB60-253-760
    YXB60-180-540
    YXB51-200-600
    YXB65-186-558
    (2) Opened type galvanized steel floor decking YX75-230-690
    YX75-200-600
    YX38-152-915
    YX51-305-915
    YX76-305-915
    YX75-230-690
    YX75-200-600
    YX51-250-750
    YX51-335-1005
    YX76-344-688
    (3) swallow tail galvanized steel floor decking YX51-200-600
    YX51-190-760
    YX51-200-800
    YX51-200-600

     

    Advantages:

    Easy On-Site Handling
    Steel decking is delivered to site in pre-cut lengths, and in pre-packaged bundles. The bundles can be easily craned into work areas, and the individual sheets quickly layed by hand. One truck can carry 1,000 sq metres of decking at a time, and a team can install up to 400 sq metres in a day.

    Speedy, Safe Construction
    A composite slab effectively acts as a safe working platform. Once the slab is poured, following trades can get on with their jobs below almost immediately. At the same time, work can continue unhindered on the floors above, allowing simple installation of services. Cable trays, ductwork and service pipes can be suspended neatly underneath the slab with purpose designed clips, brackets and hangers that locate easily and quickly into recesses in the steel decking profile.

     

    While FASEC Rebar-truss triangle welded metal decking system adapts rapid construction requirements of the main steel structure and provide fast work procedures. It can save a lot of construction time compared to traditional floor decking system. It can also improve the rigidity of the floor and save the amount of steel and concrete, so as to reduce the project budget.

     

    The Surface embossed increase the bonding of floor deck and concrete, make the floor deck system has high-strength bearing capacity. It is totally fire-proof and can span long without middle propping.

     

    So from cost saving and time saving view, the FASEC rebar-truss triangle welded metal decking system is better choice. However, in much of ready design, the deck is already designed and in avoiding of redesign, recalculation and re-submit/approval, we can also offer various customized steel floor deck profiles to cater for various contractors’ need, meanwhile we will offer various technical support in the aspects of load span and stress analysis etc.

     

    Following are some typical detail:

    Comflor 210 , Comflor 60 , Comflor 80 Composite Floor Deck Equivalent Sheet Machine Existing

     

    Warmly welcome various clients from International market to enquiry and visit us!

    Contact Details
    Hangzhou USEU Metal Manufacturing Company

    Contact Person: Mr. Tomy.Gao

    Tel: 86-571-87688170

    Fax: 86-571-56379287

    Send your inquiry directly to us (0 / 3000)